Project Brief:
This sustainable school is broken into 2 parts:
Project 2: Develope Masterplan for the school
Project 3: Design a sustainable school building chosen from the designed Masterplan
This sustainable school is broken into 2 parts:
Project 2: Develope Masterplan for the school
Project 3: Design a sustainable school building chosen from the designed Masterplan
So, during these 2 week process, group 20 + 25 went for a site visit twice. The first visit was an introduction regarding to the brief, and a quick glimpse on Torquay's background....
Then we went to the actual site to do some site analysis the week after the first trip...
Just a photo of our group members (Group 20+25)...
From left to right:
Ping, Michael, Andrew, Dangdang, David Chung
From left to right:
Ping, Michael, Andrew, Dangdang, David Chung
Site photos are taken in order to understant a bit more of its topography such as water runoff, surrounding neighbours, link to site, wind issue and so on...
Panorama 1
This shot shows how the existing site is linking with its neighbouring boundary. The basketball court and oval may be a good way to link the school together by putting a gym near it.
Panorama 2
Panorama 3
This shot shows a slight water runoff direction, and a minor slope that is hard to notice. However in general it is still a pretty flat site to work on.