Monday, September 8, 2008

Project 2: Masterplan (Phase 1)

Well, the first thing that we came to resolve was the traffic problem on Grossmans Road, we decided to knock half of the existing council building off and use it as an administration building. The other half was to create a bus only drop-off zone, then open a new access at the private land area for staff and student parking.

After that we began to place our building into the site...library we tend to have it centralized with more open area surrounding it as an outdoor learning space.

Gym was placed on the south-west in order to link up with existing oval and basketball court.

Design Technology class room located near carpark area for easy unload material.

Performing art theatre located near car park for easy access during after hours performing events.



After the review, we are told to touch up the masterplan, redefine a better solution for wind problem, reconsider gym as a public space and place near the carpark, and provide a more centralized open space rather than having building scatter all around the site...

No comments: